Marmara Engineering Industries

2012 / 2024 · Al-Karmah, Anbar, Iraq

United Gypsum — Furnace Covers

Design and fabrication of two furnace covers — the old furnace (2012) and the new furnace (2024) — each with on-site installation per requirements.

United Gypsum — Furnace Covers 1
United Gypsum — Furnace Covers 2
United Gypsum — Furnace Covers 3
United Gypsum — Furnace Covers 4
United Gypsum — Furnace Covers 5
United Gypsum — Furnace Covers 6